top of page

Education

Kuraby State School

Creating vibrant and low-maintenance educational spaces

Kuraby State School embarked on a transformative journey with funding from the Building the Education Revolution program to bring their vision of a multi-purpose hall and dedicated science and technology building to life. Our expertise in education architecture and design allowed us to create functional, visually appealing, and low-maintenance spaces that enhance the learning environment.

The design of the buildings incorporated a clever split, featuring a covered open learning area that offers versatility and fosters interactive educational experiences. This expansive addition seamlessly connects with the adjacent pre-school, establishing efficient paths of travel throughout the school campus. A meticulously designed forecourt extends from the hall and kitchen, incorporating terraced levels that ensure accessibility for all, including disabled individuals. Positioned at the front of the school, the main entry provides easy public access and establishes a strong connection with the surrounding street.

The multi-purpose hall, situated away from the main road, illuminates the night with an enchanting glow, making it a captivating performance area and offering breakout spaces within the school environment. To ensure long-term durability and reduce maintenance requirements, we carefully selected robust materials. Adding to the vibrancy of the space, a playful and vibrant colour palette was employed, infusing energy and excitement into the facility.

Our design not only caters to the school's primary functions but also positions the space as a versatile venue for community events. With our expertise in education architecture and a focus on creating engaging, low-maintenance environments, we can help transform your educational institution into a vibrant hub of learning, collaboration, and community engagement.

PROJECT OVERVIEW

CLIENT
Grindley Constructions

LOCATION
Kuraby, Brisbane, Queensland, Australia

FLOOR AREA
770m2

STATUS
Completed 2010

PROJECT MANAGEMENT
Davis Langdon

PROJECT VALUE
$2.1M

BUILDER
Grindley Constructions

Feeling inspired? Get in touch
11-A405_024.jpg
11-A405_024.jpg
11-A405_024.jpg
11-A405_024.jpg
11-A405_024.jpg
11-A405_044.jpg
AW20110803_0271.jpg
11-A405_088.jpg

Feeling inspired? Touch base with us 

bottom of page